Program 01: IN ADVANCE

The In Advance program is generally used for planned demand management events. In Advance and Dynamic programs use the same signals but are diferentiated by market context. The concept of the In Advance program is to indicate to the flexibility
supplier that a flexibility event is expected in the future (typically days), and the details of event time and payload will be updated before the event starts. Usually, the event modification message will occur. For example; the evening before the event
is due to start.

Programme Detail:

  • Location: Network-wide or geo-targetted.
  • Event Active Period*: Minimum 30 minutes.
  • Load change required: Specified by EDB.
  • Timing (start time, end time): Specified by EDB.
  • Event ID: Provides a link to any pre-event notification.
  • Event notification: Provided at least 7 days in advance.
  • Dispatch instruction confirming details of an event is provided 24 hours in advance. Confirmation message required from Flexibility Supplier 12 hours in advance.

*Note. Event Active Period refers to the period of time during which a change in the load profile is being requested as part of a DF event (definition from OpenADR programme guide).